BTAC working Bee. Jan. 25-27. 2020.

https://www.ski.com.au/xf/threads/track ... -20.86513/
A report and some photos can be found at this weblink. Some good work clearing the tracks in the East Tyers River area including a segment of the AAWT was completed along with bridge building and the like. It was all carried out by volunteers.
A report and some photos can be found at this weblink. Some good work clearing the tracks in the East Tyers River area including a segment of the AAWT was completed along with bridge building and the like. It was all carried out by volunteers.