paidal_chalne_vala wrote:Unless PV have fixed the bridge over the creek at the bottom of BA spur then you will have to do a log crossing with a full pack. Don't look down!
Baeng72 wrote:paidal_chalne_vala wrote:Unless PV have fixed the bridge over the creek at the bottom of BA spur then you will have to do a log crossing with a full pack. Don't look down!
*&%$#! that! I'd be going through the creek. That'd be a sure thing for me to drop a few meters and break something.
paidal_chalne_vala wrote:Photos from my Sept. 2015 mission up and down the BA spur. Give it a year or two more and I might have forgotten enough of the pain to try it again ;-P
https://get.google.com/albumarchive/113 ... Mn2mfP8sgE
GBW wrote:Baeng72 wrote:paidal_chalne_vala wrote:Unless PV have fixed the bridge over the creek at the bottom of BA spur then you will have to do a log crossing with a full pack. Don't look down!
*&%$#! that! I'd be going through the creek. That'd be a sure thing for me to drop a few meters and break something.
There was no way I was attempting that log crossing in the rain without spikes, it was like ice. I had visions of a broken ankle if I fell so waded through. I saw a recent report on the BA and a photo seemed to indicate the bridge had been repaired.
Blasthiker wrote:How can I find out if the bridge has been repaired?
Users browsing this forum: No registered users and 12 guests